Case Study
S&B Engineers Case Study
Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.
White Paper
The Aspen DMC3 Difference
Learn how Aspen DMC3 enables you to shape the economics of APC solutions to meet business objectives and modify the behavior of the controller to fit the needs of any phase of the lifecycle.
Brochure
Aspen Plant Scheduler
Generate optimal production schedules to maximize profitability and meet service levels with the Aspen Plant Scheduler Family.
Case Study
Linde Engineering Efficiency Across Project Lifecycle
Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6. They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.
Case Study
Transforming Sales and Operations Planning at Criterion
Learn why Criterion Catalysts uses Aspen Plant Scheduler to ensure they are able to fulfill their sales demands while alerting them of inventory problems. The solution is a critical part of their monthly Sales and Operations Planning (S&OP) process, and provides them with global supply chain and inventory visibility 12 months out in the future.
Case Study
Hitachi Zosen Case Study
ACM is extremely powerful in reducing engineering time by up to 30% for new and novel processes.
White Paper
Make Your Estimate a True Strategic Weapon
Adoption of ACCE can easily follow a known process that leverages organizational alignment, implementation of the software and a change in workflow processes that maximizes benefits.
Page 329 of 366