A remedy for cost overruns, project delays
AspenTech drives value at OPTIMIZE 2015
The new era in Advanced Process Control
Driving efficiency
Keeping chemical processes safe
How to develop the optimal cleaning strategy for crude pre-heat trains?
Modeling and Simulation Move Forward
The engineer inside the system