News Article

Cut time-to-market for coal-to-liquid energy projects

Cut time-to-market for coal-to-liquid energy projects

Case Study

PEMEX agiliza la ejecución de proyectos con diseño optimizado y estimación de costo

Descubra por qué PEMEX eligió una solución de aspenONE para ayudarlo a construir un Centro de Excelencia para impulsar el rendimiento operativo.

News Article

Appetite for LNG grows

Appetite for LNG grows

Case Study

Owens Corning Standardizes on Aspen Plant Scheduler and Receives Rapid Deployment Results

Find out how Owens Corning went live concurrently across 14 manufacturing locations with Aspen Plant Scheduler in less than 12 weeks, and enabled schedulers to make decisions that were impossible to make just a few years earlier.

News Article

Qenos makes a step change

Qenos makes a step change

News Article

How to use failure fingerprints to eliminate plant disruption

PACE - How to use failure fingerprints to eliminate plant disruption

Case Study

Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.

News Article

Optimising midstream with an integrated simulation environment

Optimising midstream with an integrated simulation environment

News Article

Unlocking the Darwinian code

Unlocking the Darwinian code

News Article

Failure is not an option - creating a world that doesn't break down

Failure is not an option - creating a world that doesn't break down

Page 106 of 194