Sitecore Version 10.4 - Refreshed

Case Study with Borouge: Maximizing Feed Utilization and Yields by Dynamically Optimizing Olefins Production


A leading petrochemical company with one of the world’s largest, most sophisticated integrated petrochemical complexes, Borouge was looking to gain greater visibility over processes to accommodate feed fluctuations and better coordinate operating conditions across multiple units.

Learn how using Aspen GDOT at Borouge’s ethylene plant resulted in over $25M USD/annum in direct benefits through yield improvement, feedstock utilization and energy savings. In addition, Aspen GDOT enabled Borouge to:

  • Achieve real-time process visibility and monitoring
  • Enable easy coordination and optimization of multiple production trains
  • Reduce emissions and advance site sustainability goals
  • Minimize manual operator intervention

Discover how Aspen GDOT can help you maximize production, reduce energy consumption and minimize feedstock losses.

 

By submitting this form, I agree to AspenTech's Privacy and Security Policy

Are you a current user of AspenTech solutions?

Please complete the captcha.

Thank you for downloading this resource

If your download did not begin