Aspen Economic Evaluation Family コスト積算ツールの活用による迅速かつ確度の高いプロジェクトコスト見積り方法の紹介
コスト積算ツールであるAspen Economic Evaluation Familyを紹介します。一般的に確度の高いプロジェクトコストの見積りを得るためには多くの労力と時間を必要としますが、そのために競争優位を失ってしまいます。 今回紹介するAspen Economic Evaluation Familyでは、最新のコストデータ、設備のコストカーブ、標準P&IDに基づき、確度の高い見積りを迅速に簡単に得ることが可能となり、意思決定までのリードタイムの短縮化が可能となります。
Maturus Optimi Gets Out of the Gate Fast
Learn how Maturus Optimi leveraged the aspenONE Engineering Desktop to manage business risk in a small company through affordable, scalable access to software. Maturus Optimi helped clients achieve better capital estimates during the feasibility study and early conceptual designs solved difficult process problems with access to a complete suite of best-in-class modeling tools.
Linde Engineering Efficiency Across Project Lifecycle
Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6. They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.
Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets
Learn how S&B reduces estimating man-hours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.
Process Ecology Saves up to $60K/Day by Reducing Emissions and Avoiding Shutdowns at Gas Dehydration Facilities
Learn how Process Ecology, a Calgary-based oil and gas consultancy that assists gas processing plants in the operation of their facilities, used Aspen HYSYS to model and provide operating strategies to minimize air emissions, optimize use of solvents and eliminate permit violations.
Reliance Industries Ltd Troubleshoots with Aspen Plus and Saves $2.4M USD per Year
Reliance, an Indian conglomerate, built an Aspen Plus model in-house for a distillation column revamp with Aspen Plus which resulted in increased production by $2.4M/year. Learn how they saved money by building the simulations themselves and coming up with a cost-effective solution.
S&B Engineers Case Study
Learn how S&B reduces estimating manhours by between 50-80% depending on project stage through use of ACCE on all bids and estimates.
Korea's SK E&C Reduces Engineering Estimating Man-Hours by 50% With Aspen Capital Cost Estimator™
Learn how SK Engineering & Construction improved the speed and accuracy of their capital project cost estimates with Aspen Capital Cost Estimator (ACCE).
Strategic Estimating Systems (SES)
Learn how SES, one of the leading estimating organizations worldwide, saves 70% manhours using ACCE. SES is responsible for, estimating projects such as SADARA, Suncor Tar Sands, and Mozambique LNG using ACCE.
PEMEX Out-Performs Industry Benchmarks for Major Capital Projects Estimating
Learn how PEMEX achieved less than 15% estimating variance over a five-year period with 30 major refining projects.